HTS Heading 3501

Casein, caseinates and other casein derivatives; casein glues

All 4 HTS codes under heading 3501 (casein), with their duty rates from the 2026 HTS Revision 23. General duty Free to 6%, some per unit.

Every line of heading 3501

  • 3501 Casein, caseinates and other casein derivatives; casein glues.
  • 3501.10 Casein (under: Casein, caseinates and other casein derivatives; casein glues).
  • 3501.10.10.00 Milk protein concentrate (under: Casein) (kg, kg msc): General 0.37¢/kg; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 12¢/kg.
  • 3501.10.50.00 Other (under: Casein) (kg, kg msc): General Free; Special none; Column 2 Free.
  • 3501.90 Other (under: Casein, caseinates and other casein derivatives; casein glues).
  • 3501.90.20.00 Casein glues (under: Other) (kg): General 6%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 30%.
  • 3501.90.60.00 Other (under: Other) (kg, kg msc): General 0.37¢/kg; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 12.1¢/kg.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.