HTS Heading 3502
Albumins (including concentrates of two or more whey proteins, containing by weight more than 80 percent whey proteins, calculated on the dry matter), albuminates and other albumin derivatives
All 4 HTS codes under heading 3502 (albumins), with their duty rates from the 2026 HTS Revision 23. General duty Free, some per unit.
Every line of heading 3502
- 3502 Albumins (including concentrates of two or more whey proteins, containing by weight more than 80 percent whey proteins, calculated on the dry matter), albuminates and other albumin derivatives.
- 3502.11.00.00 Dried (under: Egg albumin) (kg): General 47.6¢/kg; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P, PA,PE,S,SG); Column 2 59.5¢/kg.
- 3502.19.00.00 Other (under: Egg albumin) (kg): General 9.7¢/kg; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P, PA,PE,S,SG); Column 2 24.3¢/kg.
- 3502.20.00.00 Milk albumin, including concentrates of two or more whey proteins (kg, kg msc): General Free; Special none; Column 2 Free.
- 3502.90.00.00 Other (under: Albumins (including concentrates of two or more whey proteins, containing by weight more than 80 percent whey proteins, calculated on the dry matter), albuminates and other albumin derivatives) (kg): General Free; Special none; Column 2 Free.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.