HTS Heading 3503

Gelatin (including gelatin in rectangular (including square) sheets, whether or not surfaceworked or colored) and gelatin derivatives; isinglass; other glues of animal origin, excluding casein glues of heading 3501

All 6 HTS codes under heading 3503 (gelatin), with their duty rates from the 2026 HTS Revision 23. General duty 1.5% to 3.8%, some per unit.

Every line of heading 3503

  • 3503.00 Gelatin (including gelatin in rectangular (including square) sheets, whether or not surfaceworked or colored) and gelatin derivatives; isinglass; other glues of animal origin, excluding casein glues of heading 3501.
  • 3503.00.10.00 Fish glue (under: Gelatin (including gelatin in rectangular (including square) sheets, whether or not surfaceworked or colored) and gelatin derivatives; isinglass; other glues of animal origin, excluding casein glues of heading 3501) (kg): General 1.2¢/kg + 1.5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 17.6¢/kg + 25%.
  • 3503.00.20.00 Valued under 88 cents per kg (under: Inedible gelatin and animal glue) (kg): General 1.2¢/kg + 3.2%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P, PA,PE,S,SG); Column 2 5.5¢/kg + 20%.
  • 3503.00.40.00 Valued 88 cents or more per kg (kg): General 2.8¢/kg + 3.8%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM, P, PA,PE,S,SG); Column 2 15.4¢/kg + 20%.
  • 3503.00.55 Other (under: Gelatin (including gelatin in rectangular (including square) sheets, whether or not surfaceworked or colored) and gelatin derivatives; isinglass; other glues of animal origin, excluding casein glues of heading 3501): General 2.8¢/kg + 3.8%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 15.4¢/kg + 20%.
  • 3503.00.55.10 Edible gelatin (under: Other) (kg).
  • 3503.00.55.20 Photographic gelatin (under: Other) (kg).
  • 3503.00.55.50 Other (under: Other) (kg).

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.