HTS Heading 3505
Dextrins and other modified starches (for example, pregelatinized or esterified starches); glues based on starches, or on dextrins or other modified starches
All 6 HTS codes under heading 3505 (dextrins), with their duty rates from the 2026 HTS Revision 23. General duty Free to 2.9%, some per unit.
Every line of heading 3505
- 3505 Dextrins and other modified starches (for example, pregelatinized or esterified starches); glues based on starches, or on dextrins or other modified starches.
- 3505.10.00 Dextrins and other modified starches: General 0.7¢/kg; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 6.6¢/kg.
- 3505.10.00.15 Derived from potato starch (under: Dextrin) (kg).
- 3505.10.00.20 Other (under: Dextrin) (kg).
- 3505.10.00.40 Derived from corn (maize) starch (kg).
- 3505.10.00.45 Derived from potato starch (under: Other) (kg).
- 3505.10.00.92 Other (under: Other) (kg).
- 3505.20.00.00 Glues (under: Dextrins and other modified starches (for example, pregelatinized or esterified starches); glues based on starches, or on dextrins or other modified starches) (kg): General 2.1¢/kg + 2.9%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 17.6¢/kg + 25%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.