HTS Heading 3506

Prepared glues and other prepared adhesives, not elsewhere specified or included; products suitable for use as glues or adhesives, put up for retail sale as glues or adhesives, not exceeding a net weight of 1 kg

All 5 HTS codes under heading 3506 (prepared glues), with their duty rates from the 2026 HTS Revision 23. General duty Free to 6.5%.

Every line of heading 3506

  • 3506 Prepared glues and other prepared adhesives, not elsewhere specified or included; products suitable for use as glues or adhesives, put up for retail sale as glues or adhesives, not exceeding a net weight of 1 kg.
  • 3506.10 Products suitable for use as glues or adhesives, put up for retail sale as glues or adhesives, not exceeding a net weight of 1 kg.
  • 3506.10.10.00 Animal glue, including casein glue, but not including fish glue (kg): General 6.5%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 30.4%.
  • 3506.10.50.00 Other (under: Products suitable for use as glues or adhesives, put up for retail sale as glues or adhesives, not exceeding a net weight of 1 kg) (kg): General 2.1%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 20%.
  • 3506.91 Adhesives based on polymers of headings 3901 to 3913 or on rubber.
  • 3506.91.10.00 Optically clear free-film adhesives and optically clear curable liquid adhesives of a kind used solely or principally for the manufacture of flat panel displays or touch-sensitive screen panels (kg): General Free; Special none; Column 2 20%.
  • 3506.91.50.00 Other (under: Adhesives based on polymers of headings 3901 to 3913 or on rubber) (kg): General 2.1%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 20%.
  • 3506.99.00.00 Other (under: Other) (kg): General 2.1%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 20%.

From MFG Calcs data: Adhesives and sealants

U.S. imports of adhesives and sealants (headings 3214, 3506) came to $1.25B in 2025, with $140M in calculated duty: an effective duty of 11.3%, every duty included.

Effective duty in Sep 2026: 10.3%, against 16.1% in Sep 2025.

Largest sources in 2025: Germany $296M at 11.4% effective duty; Canada $194M at 1.6% effective duty; Mexico $154M at 0.8% effective duty; China $95.0M at 50.4% effective duty; South Korea $58.7M at 8.3% effective duty.

These are family totals from U.S. import statistics published through USITC DataWeb, not this heading's rate alone; effective duty is calculated duty as a share of customs value, an estimate, not a ruling.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.