HTS Heading 3602
Prepared explosives, other than propellant powders
All 2 HTS codes under heading 3602 (prepared explosives, other than propellant powders), with their duty rates from the 2026 HTS Revision 23. General duty Free.
Every line of heading 3602
- 3602.00.00 Prepared explosives, other than propellant powders: General Free; Special none; Column 2 Free.
- 3602.00.00.30 Dynamite and other high explosives, put up in cartridges, sticks or other forms, suitable for blasting (kg).
- 3602.00.00.60 Other (under: Prepared explosives, other than propellant powders) (kg).
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.