HTS Heading 3603
Safety fuses; detonating cords; percussion or detonating caps; igniters; electric detonators
All 6 HTS codes under heading 3603 (safety fuses), with their duty rates from the 2026 HTS Revision 23. General duty 0.2% to 4.2%.
Every line of heading 3603
- 3603 Safety fuses; detonating cords; percussion or detonating caps; igniters; electric detonators.
- 3603.10.00.00 Safety fuses (under: Safety fuses; detonating cords; percussion or detonating caps; igniters; electric detonators) (thousand m): General 3%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 8.3%.
- 3603.20.00.00 Detonating cords (under: Safety fuses; detonating cords; percussion or detonating caps; igniters; electric detonators) (thousand m): General 3%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 8.3%.
- 3603.30.00.00 Percussion caps (under: Safety fuses; detonating cords; percussion or detonating caps; igniters; electric detonators) (thousands): General 4.2%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 30%.
- 3603.40.00.00 Detonating caps (under: Safety fuses; detonating cords; percussion or detonating caps; igniters; electric detonators) (No.): General 0.2%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 0.3%.
- 3603.50.00.00 Igniters (under: Safety fuses; detonating cords; percussion or detonating caps; igniters; electric detonators) (No.): General 0.2%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 0.3%.
- 3603.60.00.00 Electric detonators (under: Safety fuses; detonating cords; percussion or detonating caps; igniters; electric detonators) (No.): General 0.2%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 0.3%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.