HTS Heading 3605

Matches, other than pyrotechnic articles of heading 3604

All 2 HTS codes under heading 3605 (matches), with their duty rates from the 2026 HTS Revision 23. General duty Free.

Every line of heading 3605

  • 3605.00.00 Matches, other than pyrotechnic articles of heading 3604: General Free; Special none; Column 2 20¢/gross of immediate containers.
  • 3605.00.00.30 Matches with natural wood stems (kg).
  • 3605.00.00.60 Other (under: Matches, other than pyrotechnic articles of heading 3604) (kg).

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.