HTS Heading 3604
Fireworks, signaling flares, rain rockets, fog signals and other pyrotechnic articles
All 4 HTS codes under heading 3604 (fireworks, signaling flares, rain rockets), with their duty rates from the 2026 HTS Revision 23. General duty 2.4% to 6.5%.
Every line of heading 3604
- 3604 Fireworks, signaling flares, rain rockets, fog signals and other pyrotechnic articles.
- 3604.10 Fireworks (under: Fireworks, signaling flares, rain rockets, fog signals and other pyrotechnic articles).
- 3604.10.10.00 Display or special fireworks (Class 1.3G) (kg): General 2.4%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 12.5%.
- 3604.10.90 Other (including Class 1.4G) (under: Fireworks): General 5.3%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 12.5%.
- 3604.10.90.10 Class 1.4G (Class C) (under: Other (including Class 1.4G)) (kg).
- 3604.10.90.50 Other (under: Other (including Class 1.4G)) (kg).
- 3604.90.00.00 Other (under: Fireworks, signaling flares, rain rockets, fog signals and other pyrotechnic articles) (kg): General 6.5%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.