HTS Heading 3701
Photographic plates and film in the flat, sensitized, unexposed, of any material other than paper, paperboard or textiles; instant print film in the flat, sensitized, unexposed, whether or not in packs
All 10 HTS codes under heading 3701 (photographic plates and film in the flat), with their duty rates from the 2026 HTS Revision 23. General duty Free to 3.7%.
Every line of heading 3701
- 3701 Photographic plates and film in the flat, sensitized, unexposed, of any material other than paper, paperboard or textiles; instant print film in the flat, sensitized, unexposed, whether or not in packs.
- 3701.10.00 For X-ray (under: Photographic plates and film in the flat, sensitized, unexposed, of any material other than paper, paperboard or textiles; instant print film in the flat, sensitized, unexposed, whether or not in packs): General 3.7%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 3701.10.00.30 Medical, other than dental (under: For X-ray) (m2).
- 3701.10.00.60 Other (under: For X-ray) (m2).
- 3701.20.00 Instant print film (under: Photographic plates and film in the flat, sensitized, unexposed, of any material other than paper, paperboard or textiles; instant print film in the flat, sensitized, unexposed, whether or not in packs): General 3.7%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,JP,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 3701.20.00.30 For color photography (polychrome) (No.).
- 3701.20.00.60 Other (under: Instant print film) (No.).
- 3701.30.00.00 Other plates and film, with any side exceeding 255 mm (m2): General Free; Special none; Column 2 25%.
- 3701.91.00 For color photography (polychrome): General 3.7%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 3701.91.00.30 Disc film (under: For color photography (polychrome)) (No.).
- 3701.91.00.60 Other (under: For color photography (polychrome)) (m2).
- 3701.99 Other (under: Other).
- 3701.99.30.00 Dry plates (under: Other) (m2): General Free; Special none; Column 2 20%.
- 3701.99.60 Other (under: Other): General Free; Special none; Column 2 25%.
- 3701.99.60.30 Graphic arts film (under: Other) (m2).
- 3701.99.60.60 Other (under: Other) (m2).
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.