HTS Heading 3702
Photographic film in rolls, sensitized, unexposed, of any material other than paper, paperboard or textiles; instant print film in rolls, sensitized, unexposed
All 24 HTS codes under heading 3702 (photographic film in rolls, sensitized), with their duty rates from the 2026 HTS Revision 23. General duty Free to 3.7%.
Every line of heading 3702
- 3702 Photographic film in rolls, sensitized, unexposed, of any material other than paper, paperboard or textiles; instant print film in rolls, sensitized, unexposed.
- 3702.10.00 For X-ray (under: Photographic film in rolls, sensitized, unexposed, of any material other than paper, paperboard or textiles; instant print film in rolls, sensitized, unexposed): General 3.7%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 3702.10.00.30 Medical, other than dental (under: For X-ray) (m2).
- 3702.10.00.60 Other (under: For X-ray) (m2).
- 3702.31.01.00 For color photography (polychrome) (No.): General 3.7%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 3702.32.01 Other, with silver halide emulsion: General 3.7%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 3702.32.01.30 Microfilm (under: Other, with silver halide emulsion) (m2).
- 3702.32.01.60 Other (under: Other, with silver halide emulsion) (m2).
- 3702.39.01.00 Other (under: Other film, without perforations, of a width not exceeding 105 mm) (m2): General 3.7%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 3702.41.01.00 Of a width exceeding 610 mm and of a length exceeding 200 m, for color photography (polychrome) (m2): General 3.7%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 3702.42.01.00 Of a width exceeding 610 mm and of a length exceeding 200 m, other than for color photography (m2): General 3.7%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 3702.43.01.00 Of a width exceeding 610 mm and of a length not exceeding 200 m (m2): General 3.7%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 3702.44.01 Of a width exceeding 105 mm but not exceeding 610 mm: General 3.7%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 3702.44.01.30 Graphic arts film (under: Of a width exceeding 105 mm but not exceeding 610 mm) (m2).
- 3702.44.01.60 Other (under: Of a width exceeding 105 mm but not exceeding 610 mm) (m2).
- 3702.52.01 Of a width not exceeding 16 mm: General 3.7%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 3702.52.01.30 Reversal color film (under: Of a width not exceeding 16 mm) (m2).
- 3702.52.01.60 Other (under: Of a width not exceeding 16 mm) (m2).
- 3702.53.00 Of a width exceeding 16 mm but not exceeding 35 mm and of a length not exceeding 30 m, for slides: General 3.7%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 3702.53.00.30 35 mm (under: Of a width exceeding 16 mm but not exceeding 35 mm and of a length not exceeding 30 m, for slides) (No.).
- 3702.53.00.60 Other (under: Of a width exceeding 16 mm but not exceeding 35 mm and of a length not exceeding 30 m, for slides) (No.).
- 3702.54.00 Of a width exceeding 16 mm but not exceeding 35 mm and of a length not exceeding 30 m, other than for slides: General 3.7%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 3702.54.00.30 35 mm (under: Of a width exceeding 16 mm but not exceeding 35 mm and of a length not exceeding 30 m, other than for slides) (No.).
- 3702.54.00.60 Other (under: Of a width exceeding 16 mm but not exceeding 35 mm and of a length not exceeding 30 m, other than for slides) (No.).
- 3702.55.00 Of a width exceeding 16 mm but not exceeding 35 mm and of a length exceeding 30 m: General Free; Special none; Column 2 38¢/m2.
- 3702.55.00.30 Reversal color film (under: Of a width exceeding 16 mm but not exceeding 35 mm and of a length exceeding 30 m) (m2).
- 3702.55.00.60 Other (under: Of a width exceeding 16 mm but not exceeding 35 mm and of a length exceeding 30 m) (m2).
- 3702.56.00 Of a width exceeding 35 mm (under: Other film, for color photography (polychrome)): General Free; Special none; Column 2 38¢/m2.
- 3702.56.00.30 Motion-picture film (under: Of a width exceeding 35 mm) (m, m2).
- 3702.56.00.60 Other (under: Of a width exceeding 35 mm) (m2).
- 3702.96.00.00 Of a width not exceeding 35 mm and of a length not exceeding 30 m (m2): General 3.7%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 3702.97.00.00 Of a width not exceeding 35 mm and of a length exceeding 30 m (m2): General Free; Special none; Column 2 38¢/m2.
- 3702.98.00.00 Of a width exceeding 35 mm (under: Other) (m2): General 3.7%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.