HTS Heading 3703
Photographic paper, paperboard and textiles, sensitized, unexposed
All 11 HTS codes under heading 3703 (photographic paper), with their duty rates from the 2026 HTS Revision 23. General duty 2.8% to 3.7%.
Every line of heading 3703
- 3703 Photographic paper, paperboard and textiles, sensitized, unexposed.
- 3703.10 In rolls of a width exceeding 610 mm.
- 3703.10.30 Silver halide papers (under: In rolls of a width exceeding 610 mm): General 3.7%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 30%.
- 3703.10.30.30 For color photography (polychrome) (m2).
- 3703.10.30.60 Other (under: For pictorial use (continuous tone)) (m2).
- 3703.10.30.90 Other (line reproduction) (under: Silver halide papers) (m2).
- 3703.10.60.00 Other (under: In rolls of a width exceeding 610 mm) (m2): General 3.1%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 30%.
- 3703.20 Other, for color photography (polychrome).
- 3703.20.30 Silver halide papers (under: Other, for color photography (polychrome)): General 3.7%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 30%.
- 3703.20.30.30 For pictorial use (continuous tone) (m2).
- 3703.20.30.60 Other (line reproduction) (under: Silver halide papers) (m2).
- 3703.20.60.00 Other (under: Other, for color photography (polychrome)) (m2): General 3.1%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 30%.
- 3703.90 Other (under: Photographic paper, paperboard and textiles, sensitized, unexposed).
- 3703.90.30 Silver halide papers (under: Other): General 3.7%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 30%.
- 3703.90.30.30 In sheets (under: For pictorial use (continuous tone)) (m2).
- 3703.90.30.60 Other (under: For pictorial use (continuous tone)) (m2).
- 3703.90.30.90 Other (line reproduction) (under: Silver halide papers) (m2).
- 3703.90.60.00 Other (under: Other) (m2): General 2.8%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.