HTS Heading 3801

Artificial graphite; colloidal or semi-colloidal graphite; preparations based on graphite or other carbon in the form of pastes, blocks, plates or other semimanufactures

All 7 HTS codes under heading 3801 (artificial graphite), with their duty rates from the 2026 HTS Revision 23. General duty Free to 4.9%.

Every line of heading 3801

  • 3801 Artificial graphite; colloidal or semi-colloidal graphite; preparations based on graphite or other carbon in the form of pastes, blocks, plates or other semimanufactures.
  • 3801.10 Artificial graphite (under: Artificial graphite; colloidal or semi-colloidal graphite; preparations based on graphite or other carbon in the form of pastes, blocks, plates or other semimanufactures).
  • 3801.10.10.00 Plates, rods, powder and other forms, wholly or partly manufactured, for manufacturing into brushes for electric generators, motors or other machines or appliances (kg): General 3.7%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
  • 3801.10.50 Other (under: Artificial graphite): General Free; Special none; Column 2 10%.
  • 3801.10.50.10 Surface-modified spherical graphite (kg).
  • 3801.10.50.90 Other (under: Other) (kg).
  • 3801.20.00.00 Colloidal or semi-colloidal graphite (kg): General Free; Special none; Column 2 10%.
  • 3801.30.00.00 Carbonaceous pastes for electrodes and similar pastes for furnace linings (kg): General 4.9%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 30%.
  • 3801.90.00 Other (under: Artificial graphite; colloidal or semi-colloidal graphite; preparations based on graphite or other carbon in the form of pastes, blocks, plates or other semimanufactures): General 4.9%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
  • 3801.90.00.10 Active anode material containing silicon (kg).
  • 3801.90.00.50 Other (under: Other) (kg).

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.