HTS Heading 3802
Activated carbon; activated natural mineral products; animal black, including spent animal black
All 6 HTS codes under heading 3802 (activated carbon), with their duty rates from the 2026 HTS Revision 23. General duty 2.5% to 5.8%.
Every line of heading 3802
- 3802 Activated carbon; activated natural mineral products; animal black, including spent animal black.
- 3802.10.00 Activated carbon (under: Activated carbon; activated natural mineral products; animal black, including spent animal black): General 4.8%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
- 3802.10.00.10 Derived from coal (under: Activated carbon) (kg).
- 3802.10.00.20 Derived from coconut (under: Activated carbon) (kg).
- 3802.10.00.50 Other (under: Activated carbon) (kg).
- 3802.90 Other (under: Activated carbon; activated natural mineral products; animal black, including spent animal black).
- 3802.90.10.00 Bone black (under: Other) (kg): General 5.8%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 20%.
- 3802.90.20.00 Activated clays and activated earths (kg): General 2.5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 0.6¢/kg +30%.
- 3802.90.50.00 Other (under: Other) (kg): General 4.8%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.