HTS Heading 3804

Residual lyes from the manufacture of wood pulp, whether or not concentrated, desugared or chemically treated, including lignin sulfonates, but excluding tall oil of heading 3803

All 2 HTS codes under heading 3804 (residual lyes from the manufacture), with their duty rates from the 2026 HTS Revision 23. General duty Free to 3.7%.

Every line of heading 3804

  • 3804.00 Residual lyes from the manufacture of wood pulp, whether or not concentrated, desugared or chemically treated, including lignin sulfonates, but excluding tall oil of heading 3803.
  • 3804.00.10.00 Lignin sulfonic acid and its salts (kg): General Free; Special none; Column 2 20%.
  • 3804.00.50.00 Other (under: Residual lyes from the manufacture of wood pulp, whether or not concentrated, desugared or chemically treated, including lignin sulfonates, but excluding tall oil of heading 3803) (kg): General 3.7%; Special Free (A+,AU,BH,CL,CO,D, E,IL,JO, KR,MA,OM,P, PA,PE,S,SG); Column 2 25%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.