HTS Heading 3805

Gum, wood or sulfate turpentine and other terpenic oils produced by the distillation or other treatment of coniferous woods; crude dipentene; sulfite turpentine and other crude para-cymene; pine oil containing alpha-terpineol as the main constituent

All 3 HTS codes under heading 3805 (gum), with their duty rates from the 2026 HTS Revision 23. General duty Free to 5%.

Every line of heading 3805

  • 3805 Gum, wood or sulfate turpentine and other terpenic oils produced by the distillation or other treatment of coniferous woods; crude dipentene; sulfite turpentine and other crude para-cymene; pine oil containing alpha-terpineol as the main constituent.
  • 3805.10.00.00 Gum, wood or sulfate turpentine oils (liters): General 5%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 5%.
  • 3805.90 Other (under: Gum, wood or sulfate turpentine and other terpenic oils produced by the distillation or other treatment of coniferous woods; crude dipentene; sulfite turpentine and other crude para-cymene; pine oil containing alpha-terpineol as the main constituent).
  • 3805.90.10.00 Pine oil (under: Other) (kg): General Free; Special none; Column 2 25%.
  • 3805.90.50.00 Other (under: Other) (kg): General 3.7%; Special Free (A+,AU,BH,CL,CO,D, E,IL,JO, KR,MA,OM,P, PA,PE,S,SG); Column 2 25%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.