HTS Heading 3806

Rosin and resin acids, and derivatives thereof; rosin spirit and rosin oils; run gums

All 5 HTS codes under heading 3806 (rosin and resin acids), with their duty rates from the 2026 HTS Revision 23. General duty 3.7% to 6.5%.

Every line of heading 3806

  • 3806 Rosin and resin acids, and derivatives thereof; rosin spirit and rosin oils; run gums.
  • 3806.10.00 Rosin and resin acids (under: Rosin and resin acids, and derivatives thereof; rosin spirit and rosin oils; run gums): General 5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 5%.
  • 3806.10.00.10 Gum rosin (under: Rosin and resin acids) (kg).
  • 3806.10.00.50 Other (under: Rosin and resin acids) (kg).
  • 3806.20.00.00 Salts of rosin, of resin acids or of derivatives of rosin or resin acids, other than salts of rosin adducts (kg): General 3.7%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
  • 3806.30.00.00 Ester gums (under: Rosin and resin acids, and derivatives thereof; rosin spirit and rosin oils; run gums) (kg): General 6.5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 15.4¢/kg + 57%.
  • 3806.90.00.00 Other (under: Rosin and resin acids, and derivatives thereof; rosin spirit and rosin oils; run gums) (kg): General 4.2%; Special Free (A,AU,BH,CL,CO,D,E, IL,JO, KR,MA,OM,P, PA,PE,S,SG); Column 2 15.4¢/kg + 57%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.