HTS Heading 3808
Insecticides, rodenticides, fungicides, herbicides, antisprouting products and plant-growth regulators, disinfectants and similar products, put up in forms or packings for retail sale or as preparations or articles (for example, sulfur-treated bands, wicks and candles, and flypapers)
All 38 HTS codes under heading 3808 (insecticides, rodenticides, fungicides), with their duty rates from the 2026 HTS Revision 23. General duty Free to 6.5%.
Every line of heading 3808
- 3808 Insecticides, rodenticides, fungicides, herbicides, antisprouting products and plant-growth regulators, disinfectants and similar products, put up in forms or packings for retail sale or as preparations or articles (for example, sulfur-treated bands, wicks and candles, and flypapers).
- 3808.52.00.00 DDT (ISO) (clofenatone (INN)), in packings of a net weight content not exceeding 300 g (kg): General 6.5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 15.4¢/kg + 31%.
- 3808.59 Other (under: Good specified in subheading note 1 to this chapter).
- 3808.59.10.00 Containing any aromatic or modified aromatic pesticide (kg): General 6.5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 15.4¢/kg + 31%.
- 3808.59.40.00 Disinfectants (under: Other) (kg): General 5%; Special Free (A,AU,BH, CL,CO,D,E,IL, JO,K,KR,MA,OM,P, PA,PE,S,SG); Column 2 25%.
- 3808.59.50.00 Other (under: Other) (kg): General 5%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,K,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 3808.61 In packings of a net weight content not exceeding 300 g.
- 3808.61.10.00 Containing any aromatic or modified aromatic pesticide (kg): General 6.5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 15.4¢/kg + 31%.
- 3808.61.50.00 Other (under: In packings of a net weight content not exceeding 300 g) (kg): General 5%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,K,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 3808.62 In packings of a net weight content exceeding 300 g but not exceeding 7.5 kg.
- 3808.62.10.00 Containing any aromatic or modified aromatic pesticide (kg): General 6.5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 15.4¢/kg + 31%.
- 3808.62.50.00 Other (under: In packings of a net weight content exceeding 300 g but not exceeding 7.5 kg) (kg): General 5%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 3808.69 Other (under: Good specified in subheading note 2 to this chapter).
- 3808.69.10.00 Containing any aromatic or modified aromatic pesticide (kg): General 6.5%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 15.4¢/kg + 31%.
- 3808.69.50.00 Other (under: Other) (kg): General 5%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 3808.91 Insecticides (under: Other).
- 3808.91.10.00 Fly ribbons (ribbon fly catchers) (kg): General 2.8%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
- 3808.91.15.00 Mixtures of N-[[(4-chlorophenyl)amino]- carbonyl]-2,6-difluorobenzamide and inert substances (kg): General Free; Special none; Column 2 15.4¢/kg + 31%.
- 3808.91.25.01 Other (under: Containing any aromatic or modified aromatic insecticide) (kg): General 6.5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 15.4¢/kg + 31%.
- 3808.91.30.00 Containing an inorganic substance (kg): General 5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 3808.91.50.01 Other (under: Other) (kg): General 5%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 3808.92 Fungicides (under: Other).
- 3808.92.05.00 Mixtures of dinocap and application adjuvants (kg): General Free; Special none; Column 2 15.4¢/kg + 31%.
- 3808.92.15.00 Other (under: Containing any aromatic or modified aromatic fungicide) (kg): General 6.5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 15.4¢/kg + 31%.
- 3808.92.24.00 Maneb; Zineb; Mancozeb; and Metiram (kg): General Free; Special none; Column 2 25%.
- 3808.92.28.00 Other (under: Containing any fungicide which is a thioamide, thiocarbamate, dithiocarbamate, thiuram or isothiocyanate) (kg): General 3.7%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 3808.92.30.00 Containing an inorganic substance (kg): General 5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 3808.92.50 Other (under: Other): General 5%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 3808.92.50.40 Formulated fungicides containing any 3-iodoprop-2-yn-1-yl butylcarbamate(IPBC) (kg).
- 3808.92.50.80 Other (under: Other) (kg).
- 3808.93 Herbicides, anti-sprouting products and plant-growth regulators.
- 3808.93.05.00 Mixtures of 2,6-dichlorobenzonitrile and inerts; Mixtures of 3,5-dichloro-N-(1,1-dimethyl-2- propynyl) benzamide (Pronamide) and application adjuvants; Mixtures of 2-[(1-ethoxyimino)butyl]-5-[2- ethylthiopropyl]-3-hydroxy-2-cyclohexen-1- one (Sethoxydim) and application adjuvants; Mixtures of ethyl 2-[4-[(6-chloro-2- benzoxazolyl)oxy]phenoxy]propanoate (Fenoxaprop-ethyl) and isooctyl 2,4-dichlorophenoxyacetate; Mixtures of isooctyl 2-methyl-4-chlorophen- oxyacetate and application adjuvants (kg): General Free; Special none; Column 2 15.4¢/kg + 31%.
- 3808.93.15.00 Other (under: Containing any aromatic or modified aromatic herbicide, anti-sprouting agent or plant-growth regulator) (kg): General 6.5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 15.4¢/kg + 31%.
- 3808.93.20.00 Containing an inorganic substance (kg): General 5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 3808.93.50 Other (under: Other): General 5%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 3808.93.50.10 Mixtures of 2-amino-4-[hydroxy(methyl)phosphonoyl] butanoic acid (glufosinate) or its salts or esters and application adjuvants (kg).
- 3808.93.50.20 Mixtures of N-(phosphonomethyl) glycine (glyphosate) or its salts or esters and application adjuvants (kg).
- 3808.93.50.40 Other (under: Other) (kg).
- 3808.94 Disinfectants (under: Other).
- 3808.94.10.00 Containing any aromatic or modified aromatic disinfectant (kg): General 6.5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,K,KR,MA,OM,P,PA,PE,S,SG); Column 2 15.4¢/kg + 31%.
- 3808.94.50 Other (under: Disinfectants): General 5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,K,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 3808.94.50.10 Wipes, other than paper wipes or nonwoven wipes, impregnated with alcohol or other disinfectants (kg).
- 3808.94.50.50 Hydrogen peroxide put up in disinfectant preparations for sanitizing or disinfecting surfaces. (kg).
- 3808.94.50.80 Alcohol-based hand sanitizer containing 60 percent or more by weight of ethanol, of a kind described in statistical note 1 to this chapter (kg).
- 3808.94.50.95 Other (under: Other) (kg).
- 3808.99 Other (under: Other).
- 3808.99.04.00 Mixtures of 1,1-bis(4-chlorophenyl)-2,2,2- trichloroethanol (Dicofol) and application adjuvants (kg): General Free; Special none; Column 2 15.4¢/kg + 31%.
- 3808.99.08.00 Other (under: Containing any aromatic or modified aromatic pesticide) (kg): General 6.5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 15.4¢/kg + 31%.
- 3808.99.30.00 Formulated biocides based on 2-methyl-4-isothiazolin-3-one, or 2-n-octyl-4-isothiazolin-3-one, or 4,5-dichloro-2-n-octyl-4-isothiazolin-3-one, or mixtures of 5-chloro-2-methyl-4- isothiazolin-3-one and 2-methyl-4- isothiazolin-3-one; and Metaldehyde (kg): General Free; Special none; Column 2 25%.
- 3808.99.70.00 Containing an inorganic substance (kg): General 5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 3808.99.95.01 Other (under: Other) (kg): General 5%; Special Free (A+,AU,BH,CL,CO,D, E,IL, JO,KR,MA,OM,P, PA,PE,S,SG); Column 2 25%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.