HTS Heading 3809
Finishing agents, dye carriers to accelerate the dyeing or fixing of dyestuffs and other products and preparations (for example, dressings and mordants), of a kind used in the textile, paper, leather or like industries, not elsewhere specified or included
All 6 HTS codes under heading 3809 (finishing agents), with their duty rates from the 2026 HTS Revision 23. General duty 3% to 6.5%, some per unit.
Every line of heading 3809
- 3809 Finishing agents, dye carriers to accelerate the dyeing or fixing of dyestuffs and other products and preparations (for example, dressings and mordants), of a kind used in the textile, paper, leather or like industries, not elsewhere specified or included.
- 3809.10.00.00 With a basis of amylaceous substances (kg): General 2.2¢/kg + 3%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 17.6¢/kg + 25%.
- 3809.91.00.00 Of a kind used in the textile or like industries (kg): General 6%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG) 3% (JP); Column 2 25%.
- 3809.92 Of a kind used in the paper or like industries.
- 3809.92.10.00 Containing 5 percent or more by weight of one or more aromatic or modified aromatic substances (kg): General 6.5%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 60%.
- 3809.92.50.00 Other (under: Of a kind used in the paper or like industries) (kg): General 6%; Special Free (A+,AU,BH,CL,CO,D, E,IL, JO,KR,MA,OM,P, PA,PE,S,SG); Column 2 25%.
- 3809.93 Of a kind used in the leather or like industries.
- 3809.93.10.00 Containing 5 percent or more by weight of one or more aromatic or modified aromatic substances (kg): General 6.5%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 60%.
- 3809.93.50.00 Other (under: Of a kind used in the leather or like industries) (kg): General 6%; Special Free (A,AU,BH,CL,CO,D, E,IL, JO,KR,MA,OM,P, PA,PE,S,SG); Column 2 25%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.