HTS Heading 3812
Prepared rubber accelerators; compound plasticizers for rubber or plastics, not elsewhere specified or included; antioxidizing preparations and other compound stabilizers for rubber or plastics
All 10 HTS codes under heading 3812 (prepared rubber accelerators), with their duty rates from the 2026 HTS Revision 23. General duty Free to 6.5%.
Every line of heading 3812
- 3812 Prepared rubber accelerators; compound plasticizers for rubber or plastics, not elsewhere specified or included; antioxidizing preparations and other compound stabilizers for rubber or plastics.
- 3812.10 Prepared rubber accelerators (under: Prepared rubber accelerators; compound plasticizers for rubber or plastics, not elsewhere specified or included; antioxidizing preparations and other compound stabilizers for rubber or plastics).
- 3812.10.10.00 Containing any aromatic or modified aromatic rubber accelerator (kg): General 6.5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 3.7¢/kg + 60%.
- 3812.10.50.00 Other (under: Prepared rubber accelerators) (kg): General 5%; Special Free (A+,AU,BH,CL,CO,D, E,IL, JO,KR,MA,OM,P, PA,PE,S,SG); Column 2 25%.
- 3812.20 Compound plasticizers for rubber or plastics.
- 3812.20.10.00 Containing any aromatic or modified aromatic plasticizer (kg): General 6.5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 15.4¢/kg + 57%.
- 3812.20.50.00 Other (under: Compound plasticizers for rubber or plastics) (kg): General 5%; Special Free (A+,AU,BH,CL,CO,D, E,IL, JO,KR,MA,OM,P, PA,PE,S,SG); Column 2 25%.
- 3812.31.00.00 Mixtures of oligomers of 2,2,4-trimethyl-1,2-dihydroquinoline (TMQ) (kg): General 6.5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,K,KR,MA,OM,P,PA,PE,S,SG); Column 2 3.7¢/kg + 60%.
- 3812.39 Other (under: Anti-oxidizing preparations and other compound stabilizers for rubber or plastics).
- 3812.39.20.00 Mixtures of N,N'-diaryl-p-phenylenediamines (kg): General 6.5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 3.7¢/kg + 60%.
- 3812.39.30.00 Master batches of poly[nitrilomethanetetraaryl- nitrilo[2,4,6- tris(1-methylethyl)-1,3- phenylene]]-2,6-bis(1-methylethyl)phenyl]-ω- [[[[2,6-bis(1-methylethyl)phenyl]amino]- methylene]amino]carbodiimide or 2,4-diisocyanate-1,3,5-tris(1-methylethyl)- benzene homopolymer with polyethylene, polyethylene terephthalate, or thermoplastic polyurethanes;Master batches of 3-(2H-benzotriazol-2-yl)-5- (tert-butyl)-4-hydroxybenzenepropanoic acid, C7-C9 branched or linear alkyl esters; andMaster batches of α-[3-[3-(2H-benzotriazol-2- yl)-5-(1,1-dimethylethyl)-4-hydroxyphenyl]-1- oxopropyl-ω-[3-[3-(2H-benzotriazol-2-yl)-5- (1,1-dimethylethyl)-4-hydroxyphenyl]-1-oxo- propyl] poly(oxyethylene) (kg): General Free; Special none; Column 2 3.7¢/kg + 60%.
- 3812.39.60.00 Other (under: Containing any aromatic or modified aromatic antioxidant or other stabilizer) (kg): General 6.5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 3.7¢/kg + 60%.
- 3812.39.70.00 Bis(1,2,2,6,6-pentamethyl-4-piperidinyl) sebacate (kg): General Free; Special none; Column 2 25%.
- 3812.39.90.00 Other (under: Other) (kg): General 5%; Special Free (A+,AU,BH,CL,CO,D, E,IL, JO,KR,MA,OM,P, PA,PE,S,SG); Column 2 25%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.