HTS Heading 3813
Preparations and charges for fire extinguishers; charged fire-extinguishing grenades
All 2 HTS codes under heading 3813 (preparations and charges), with their duty rates from the 2026 HTS Revision 23. General duty Free to 3.7%.
Every line of heading 3813
- 3813.00 Preparations and charges for fire extinguishers; charged fire-extinguishing grenades.
- 3813.00.10.00 Consisting wholly of inorganic substances (kg): General Free; Special none; Column 2 25%.
- 3813.00.50.00 Other (under: Preparations and charges for fire extinguishers; charged fire-extinguishing grenades) (kg): General 3.7%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 20%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.