HTS Heading 3814
Organic composite solvents and thinners, not elsewhere specified or included; prepared paint or varnish removers
All 4 HTS codes under heading 3814 (organic composite solvents and thinners), with their duty rates from the 2026 HTS Revision 23. General duty 6% to 6.5%.
Every line of heading 3814
- 3814.00 Organic composite solvents and thinners, not elsewhere specified or included; prepared paint or varnish removers.
- 3814.00.10.00 Containing 5 percent or more but not more than 25 percent by weight of one or more aromatic or modified aromatic substances (kg): General 6.5%; Special Free (A+,AU,BH,CL,CO,D, E,IL, JO,KR,MA,OM,P, PA,PE,S,SG); Column 2 3.7¢/kg + 60%.
- 3814.00.20.00 Containing more than 25 percent by weight of one or more aromatic or modified aromatic substances (kg): General 6.5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 15.4¢/kg + 43.5%.
- 3814.00.50 Other (under: Organic composite solvents and thinners, not elsewhere specified or included; prepared paint or varnish removers): General 6%; Special Free (A+,AU,BH,CL,CO,D, E,IL, JO,KR,MA,OM,P, PA,PE,S,SG); Column 2 25%.
- 3814.00.50.10 Containing methyl chloroform (1,1,1-trichloro- ethane) or carbon tetrachloride (kg).
- 3814.00.50.90 Other (under: Other) (kg).
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.