HTS Heading 3816

Refractory cements, mortars, concretes and similar compositions, including dolomite ramming mix, other than products of heading 3801

All 3 HTS codes under heading 3816 (refractory cements, mortars), with their duty rates from the 2026 HTS Revision 23. General duty Free to 3%.

Every line of heading 3816

  • 3816 Refractory cements, mortars, concretes and similar compositions, including dolomite ramming mix, other than products of heading 3801.
  • 3816.00.10.00 Dolomite ramming mix (under: Refractory cements, mortars, concretes and similar compositions, including dolomite ramming mix, other than products of heading 3801) (t): General Free; Special none; Column 2 30%.
  • 3816.00.20 Other (under: Refractory cements, mortars, concretes and similar compositions, including dolomite ramming mix, other than products of heading 3801): General 3%; Special Free (A, AU, BH, CL, CO,D,E, IL, JO, KR, MA, OM, P, PA, PE, S, SG); Column 2 30%.
  • 3816.00.20.10 Clay (under: Other) (kg).
  • 3816.00.20.50 Other (under: Other) (kg).

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.