HTS Heading 3817

Mixed alkylbenzenes and mixed alkylnaphthalenes, other than those of heading 2707 or 2902

All 3 HTS codes under heading 3817 (mixed alkylbenzenes and mixed alkylnaphthalenes), with their duty rates from the 2026 HTS Revision 23. General duty 6.5%.

Every line of heading 3817

  • 3817 Mixed alkylbenzenes and mixed alkylnaphthalenes, other than those of heading 2707 or 2902.
  • 3817.00.10.00 Mixed linear alkylbenzenes (under: Mixed alkylbenzenes) (kg): General 6.5%; Special Free (A+,AU,BH,CL,CO,D,E, IL,JO, KR,MA,OM,P, PA,PE,S,SG); Column 2 15.4¢/kg + 55%.
  • 3817.00.15.00 Other (under: Mixed alkylbenzenes) (kg): General 6.5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 15.4¢/kg + 55%.
  • 3817.00.20.00 Mixed alkylnaphthalenes (under: Mixed alkylbenzenes and mixed alkylnaphthalenes, other than those of heading 2707 or 2902) (kg): General 6.5%; Special Free (A+,AU,BH,CL,CO,D,E, IL,JO, KR,MA,OM,P, PA,PE,S,SG); Column 2 3.7¢/kg + 60%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.