HTS Heading 3819

Hydraulic brake fluids and other prepared liquids for hydraulic transmission, not containing or containing less than 70 percent by weight of petroleum oils or oils obtained from bituminous minerals

All 2 HTS codes under heading 3819 (hydraulic brake fluids and other prepared liquids), with their duty rates from the 2026 HTS Revision 23. General duty 6.5%.

Every line of heading 3819

  • 3819.00.00 Hydraulic brake fluids and other prepared liquids for hydraulic transmission, not containing or containing less than 70 percent by weight of petroleum oils or oils obtained from bituminous minerals: General 6.5%; Special Free (A+,AU,BH,CL,CO,D,E, IL,JO, KR,MA,OM,P, PA,PE,S,SG); Column 2 3.7¢/kg + 60%.
  • 3819.00.00.10 Hydraulic brake fluids (under: Hydraulic brake fluids and other prepared liquids for hydraulic transmission, not containing or containing less than 70 percent by weight of petroleum oils or oils obtained from bituminous minerals) (kg).
  • 3819.00.00.90 Other (under: Hydraulic brake fluids and other prepared liquids for hydraulic transmission, not containing or containing less than 70 percent by weight of petroleum oils or oils obtained from bituminous minerals) (kg).

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.