HTS Heading 3820
Antifreezing preparations and prepared deicing fluids
The HTS code under heading 3820 (antifreezing preparations and prepared deicing fluids), with its duty rates from the 2026 HTS Revision 23. General duty 6.5%.
Every line of heading 3820
- 3820.00.00.00 Antifreezing preparations and prepared deicing fluids (kg): General 6.5%; Special Free (A+,AU,BH,CL,CO,D,E, IL,JO, KR,MA,OM,P, PA,PE,S,SG); Column 2 63%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.