HTS Heading 3823
Industrial monocarboxylic fatty acids; acid oils from refining; industrial fatty alcohols
All 9 HTS codes under heading 3823 (industrial), with their duty rates from the 2026 HTS Revision 23. General duty 2% to 5.1%, some per unit.
Every line of heading 3823
- 3823 Industrial monocarboxylic fatty acids; acid oils from refining; industrial fatty alcohols.
- 3823.11.00.00 Stearic acid (under: Industrial monocarboxylic fatty acids; acid oils from refining) (kg): General 2.1¢/kg + 3.8%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 6.6¢/kg + 25%.
- 3823.12.00.00 Oleic acid (under: Industrial monocarboxylic fatty acids; acid oils from refining) (kg): General 2.1¢/kg + 3.2%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 6.6¢/kg + 20%.
- 3823.13.00 Tall oil fatty acids (under: Industrial monocarboxylic fatty acids; acid oils from refining): General 3.2%; Special Free (A+,AU,BH,CL,CO,D,E, IL,JO, KR,MA,OM,P, PA,PE,S,SG); Column 2 20%.
- 3823.13.00.20 Containing less than two percent rosin (kg).
- 3823.13.00.40 Other (under: Tall oil fatty acids) (kg).
- 3823.19 Other (under: Industrial monocarboxylic fatty acids; acid oils from refining).
- 3823.19.20.00 Derived from coconut, palm-kernel or palm oil (kg): General 2.3%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 20%.
- 3823.19.40.00 Other (under: Other) (kg): General 3.2%; Special Free (A+,AU,BH,CL,CO,D,E, IL,JO, KR,MA,OM,P, PA,PE,S,SG); Column 2 20%.
- 3823.70 Industrial fatty alcohols (under: Industrial monocarboxylic fatty acids; acid oils from refining; industrial fatty alcohols).
- 3823.70.20.00 Oleyl (under: Derived from fatty substances of animal or vegetable origin) (kg): General 5.1%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 39.5%.
- 3823.70.40.00 Other (under: Derived from fatty substances of animal or vegetable origin) (kg): General 2%; Special Free (A+,AU,BH,CL,CO,D,E, IL,JO, KR,MA,OM,P, PA,PE,S,SG); Column 2 25%.
- 3823.70.60.00 Other (under: Industrial fatty alcohols) (kg): General 2.4%; Special Free (A+,AU,BH,CL,CO,D,E, IL,JO, KR,MA,OM,P, PA,PE,S,SG); Column 2 25%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.