HTS Heading 3824

Prepared binders for foundry molds or cores; chemical products and preparations of the chemical or allied industries (including those consisting of mixtures of natural products), not elsewhere specified or included

All 48 HTS codes under heading 3824 (prepared binders for foundry molds), with their duty rates from the 2026 HTS Revision 23. General duty Free to 6.5%.

Every line of heading 3824

  • 3824 Prepared binders for foundry molds or cores; chemical products and preparations of the chemical or allied industries (including those consisting of mixtures of natural products), not elsewhere specified or included.
  • 3824.10.00.00 Prepared binders for foundry molds or cores (kg): General 6%; Special Free (A+,AU,BH,CL,CO,D,E, IL,JO, KR,MA,OM,P, PA,PE,S,SG); Column 2 25%.
  • 3824.30.00.00 Nonagglomerated metal carbides mixed together or with metallic binders (kg): General 3.6%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
  • 3824.40 Prepared additives for cements, mortars or concretes.
  • 3824.40.10.00 Containing 5 percent or more by weight of one or more aromatic or modified aromatic substances (kg): General 6.5%; Special Free (A+,AU,BH,CL,CO,D,E, IL,JO,KR,MA,OM,P, PA,PE,S,SG); Column 2 3.7¢/kg + 60%.
  • 3824.40.20.00 Consisting wholly of inorganic substances (kg): General Free; Special none; Column 2 25%.
  • 3824.40.50.00 Other (under: Prepared additives for cements, mortars or concretes) (kg): General 5%; Special Free (A+,AU,BH,CL,CO,D,E, IL,JO,KR,MA,OM,P, PA,PE,S,SG); Column 2 25%.
  • 3824.50.00 Nonrefractory mortars and concretes: General Free; Special none; Column 2 20%.
  • 3824.50.00.10 Wet (under: Nonrefractory mortars and concretes) (t).
  • 3824.50.00.50 Other (under: Nonrefractory mortars and concretes) (t).
  • 3824.60.00.00 Sorbitol other than that of subheading 2905.44 (kg): General 4.9%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 50%.
  • 3824.81.00.00 Containing oxirane (ethylene oxide) (kg): General 5%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,K,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
  • 3824.82 Containing polychlorinated biphenyls (PCBs), polychlorinated terphenyls ({PCTs) or polybrominated biphenyls (PBBs).
  • 3824.82.10.00 Chlorinated but not otherwise halogenated (kg): General 6.5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,K,KR,MA,OM,P,PA,PE,S,SG); Column 2 114.5%.
  • 3824.82.90.00 Other (under: Containing polychlorinated biphenyls (PCBs), polychlorinated terphenyls ({PCTs) or polybrominated biphenyls (PBBs)) (kg): General 3.7%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,K,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
  • 3824.83.00.00 Containing tris(2,3-dibromopropyl) phospate (kg): General 5%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,K,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
  • 3824.84.00.00 Containing aldrin (ISO), camphechlor (ISO) (toxaphene), chlordane (ISO), chlordecone (ISO), DDT (ISO) (clofenatone (INN)), 1,1,1-trichloro-2,2-bis(p-chlorophenyl)ethane), dieldrin (ISO INN), endosulfan (ISO), endrin (ISO), heptachlor (ISO) or mirex (ISO) (kg): General 6.5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,K,KR,MA,OM,P,PA,PE,S,SG); Column 2 114.5%.
  • 3824.85.00.00 Containing 1,2,3,4,5,6-hexachlorocyclohexane (HCH (ISO)), including lindane (ISO,INN) (kg): General 6.5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,K,KR,MA,OM,P,PA,PE,S,SG); Column 2 114.5%.
  • 3824.86.00.00 Containing pentachlorobenzene (ISO) or hexachlorobenzene (ISO) (kg): General 6.5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,K,KR,MA,OM,P,PA,PE,S,SG); Column 2 3.7¢/kg + 60%.
  • 3824.87.00.00 Containing perfluorooctane sulfonic acid, its salts, perfluorooctane sulfonamides, or perfluorooctane sulfonyl fluoride (kg): General 3.7%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,K,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
  • 3824.88.00.00 Containing tetra-, penta-, hexa-, hepta-, or octabromodiphenyl ethers (kg): General 6.5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,K,KR,MA,OM,P,PA,PE,S,SG); Column 2 3.7¢/kg + 60%.
  • 3824.89.00.00 Containing short-chain chlorinated paraffins (kg): General 6.5%; Special Free (A+,AU,BH,CL,CO,D,E, IL,JO, K,KR,MA,OM,P, PA,PE,S,SG); Column 2 25%.
  • 3824.91.00.00 Mixtures and preparations consisting mainly of (5-ethyl-2-methyl-2-oxido3,2-dioxaphosphinan-5-yl)methyl methylphosphonate and bis(5-ethyl-2-methyl-2-oxido-1,3,2-dioxaphosphinan-5-yl)methyl methylphosphonate (kg): General 5%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,K,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
  • 3824.92.00.00 Polyglycol esters of methylphosphonic acid. (kg): General 5%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,JP,K,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
  • 3824.99 Other (under: Other).
  • 3824.99.11.00 In the form of ingots (under: Cultured crystals (other than optical elements of chapter 90), weighing not less than 2.5 g each) (kg): General Free; Special none; Column 2 25%.
  • 3824.99.19.00 Other (under: Cultured crystals (other than optical elements of chapter 90), weighing not less than 2.5 g each) (kg): General 6.5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 50%.
  • 3824.99.21.00 Consisting wholly of substances found naturally in coal tar, whether obtained from coal tar or other source (kg): General Free; Special none; Column 2 Free.
  • 3824.99.25.00 Aqueous mixtures of triphenyl sulfonium chloride, diphenyl (4-phenylthio)phenyl sulfonium chloride and (thiodi-4,1- phenylene)bis(diphenyl sulfonium) dichloride (kg): General 6.5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,K,KR,MA,OM,P,PA,PE,S,SG); Column 2 3.7¢/kg + 60%.
  • 3824.99.26.00 Benzene, 2,4-diisocyanate-1,3,5-tris(1- methylethyl) homopolymer; 5-Fluoro-2-methyl-1-[[4-(methylsulfinyl)- phenyl]methylene]-1H-indene;Mixtures of dimethyl phthalate, t-butanol, hydrogen peroxide, and sodium salicylate; andMixtures containing derivatives of N-[4-(2- hydroxy-3-phenoxypropoxy)phenyl]- acetamide (kg): General Free; Special none; Column 2 3.7¢/kg + 60%.
  • 3824.99.29.00 Other (under: Mixtures containing 5 percent or more by weight of one or more aromatic or modified aromatic substances) (kg): General 6.5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,K,KR,MA,OM,P,PA,PE,S,SG); Column 2 3.7¢/kg + 60%.
  • 3824.99.31.00 Of bismuth (under: Mixtures of two or more inorganic compounds) (kg): General 6.5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
  • 3824.99.32.00 Of hydrosulfite compounds, of sulfoxylate compounds, or of both (kg): General 6.5%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
  • 3824.99.33.00 Of mercury (under: Mixtures of two or more inorganic compounds) (kg): General 4.2%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 26.3%.
  • 3824.99.34.00 Of molybdenum (under: Mixtures of two or more inorganic compounds) (kg): General 2.8%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 18%.
  • 3824.99.35.00 Of tungsten (under: Mixtures of two or more inorganic compounds) (kg): General 6.5%; Special Free (A+,AU,BH,CL,CO,D, E,IL, JO,KR,MA,OM,P, PA,PE,S,SG); Column 2 45.5%.
  • 3824.99.36.00 Of vanadium (under: Mixtures of two or more inorganic compounds) (kg): General 6.5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
  • 3824.99.39 Other (under: Mixtures of two or more inorganic compounds): General Free; Special none; Column 2 25%.
  • 3824.99.39.10 Of lithium nickel cobalt manganese oxides (kg).
  • 3824.99.39.90 Other (under: Other) (kg).
  • 3824.99.41 Fatty substances of animal or vegetable origin and mixtures thereof: General 4.6%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 16.5¢/kg + 30%.
  • 3824.99.41.40 Mixtures of fatty acid esters (kg).
  • 3824.99.41.90 Other (under: Fatty substances of animal or vegetable origin and mixtures thereof) (kg).
  • 3824.99.49.00 Mixtures that are in whole or in part of hydrocarbons derived in whole or in part from petroleum, shale oil or natural gas (kg): General 6.5%; Special Free (A+,AU,BH,CL,CO,D,E, IL,JO, K,KR,MA,OM,P, PA,PE,S,SG); Column 2 25%.
  • 3824.99.50.00 Chlorinated but not otherwise halogenated (kg): General 6.5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,K,KR,MA,OM,P,PA,PE,S,SG); Column 2 114.5%.
  • 3824.99.55.00 Other (under: Mixtures of halogenated hydrocarbons) (kg): General 3.7%; Special Free (A+,AU,BH,CL,CO,D, E,IL, JO,K,KR,MA,OM,P, PA,PE,S,SG); Column 2 25%.
  • 3824.99.70.00 Mixtures of dibromo neopentyl glycol; Polydibromophenylene oxide; Tetrabromobisphenol-A-carbonate oligomers; and Electroplating chemical and electroless plating solutions and other materials for printed circuit boards, plastics and metal finishings (kg): General Free; Special none; Column 2 25%.
  • 3824.99.75 Naphthenic acids, their water-insoluble salts and their esters: General 3.7%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
  • 3824.99.75.10 Naphthenic acids (under: Naphthenic acids, their water-insoluble salts and their esters) (kg).
  • 3824.99.75.50 Other (under: Naphthenic acids, their water-insoluble salts and their esters) (kg).
  • 3824.99.93 Other (under: Other): General 5%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,JP,K,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
  • 3824.99.93.10 Containing C11 or lower alcohols only (kg).
  • 3824.99.93.20 Containing C12 or higher alcohols only (kg).
  • 3824.99.93.30 Other (under: Mixtures of acyclic, monohydric, unsubstituted alcohols) (kg).
  • 3824.99.93.61 Mixtures consisting mainly of chemicals containing a phosphorus atom to which is bonded one methyl, ethyl, n-propyl or isopropyl group, but no other carbon atoms (kg).
  • 3824.99.93.86 Mixtures of a kind containing magnesium used as a desulfurization reagent (kg).
  • 3824.99.93.97 Other (under: Other) (kg).

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.