HTS Heading 3826

Biodiesel and mixtures thereof, not containing or containing less than 70 percent by weight of petroleum oils or oils obtained from bituminous materials

All 2 HTS codes under heading 3826 (biodiesel and mixtures thereof), with their duty rates from the 2026 HTS Revision 23. General duty 4.6% to 6.5%.

Every line of heading 3826

  • 3826.00 Biodiesel and mixtures thereof, not containing or containing less than 70 percent by weight of petroleum oils or oils obtained from bituminous materials.
  • 3826.00.10.00 Biodiesel not containing petroleum oils or oils obtained from bituminous materials (B100) (kg): General 4.6%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 16.5¢/kg + 30%.
  • 3826.00.30.00 Other (under: Biodiesel and mixtures thereof, not containing or containing less than 70 percent by weight of petroleum oils or oils obtained from bituminous materials) (kg): General 6.5%; Special Free (A+,AU,BH,CL,CO,D, E,IL, JO, K,KR,MA,OM,P, PA,PE,S,SG); Column 2 25%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.