HTS Heading 3827

Mixtures containing halogenated derivatives of methane, ethane or propane, not elsewhere specified or included

All 20 HTS codes under heading 3827 (mixtures containing halogenated), with their duty rates from the 2026 HTS Revision 23. General duty 3.7% to 6.5%.

Every line of heading 3827

  • 3827 Mixtures containing halogenated derivatives of methane, ethane or propane, not elsewhere specified or included.
  • 3827.11.00.00 Containing chlorofluorocarbons (CFCs), whether or not containing hydrochlorofluorocarbons (HCFCs), perfluorocarbons (PFCs) or hydrofluorocarbons (HFCs) (kg): General 3.7%; Special Free (A+, AU, BH, CL, CO, D, E, IL, JO, KR, MA, OM,P, PA, PE, S, SG); Column 2 25%.
  • 3827.12.00.00 Containing hydrobromofluorocarbons (HBFCs) (kg): General 3.7%; Special Free (A+, AU, BH, CL, CO, D, E, IL, JO, KR, MA, OM,P, PA, PE, S, SG); Column 2 25%.
  • 3827.13.00.00 Containing carbon tetrachloride (kg): General 6.5%; Special Free (A, AU, BH, CL, CO, D, E, IL, JO, K, KR, MA, OM, P,PA, PE, S, SG); Column 2 114.5%.
  • 3827.14.00.00 Containing 1,1,1-trichloroethane (methyl chloroform) (kg): General 6.5%; Special Free (A, AU, BH, CL, CO, D, E, IL, JO, K, KR, MA, OM, P,PA, PE, S, SG); Column 2 114.5%.
  • 3827.20.00.00 Containing bromochlorodifluoromethane (Halon-1211), bromotrifluoromethane (Halon-1301) or dibromotetrafluoroethanes (Halon-2402) (kg): General 3.7%; Special Free (A+, AU, BH, CL, CO, D, E, IL, JO, KR, MA, OM,P, PA, PE, S, SG); Column 2 25%.
  • 3827.31.00.00 Containing substances of subheadings 2903.41 to 2903.48 (kg): General 3.7%; Special Free (A+, AU, BH, CL, CO, D, E, IL, JO, KR, MA, OM,P, PA, PE, S, SG); Column 2 25%.
  • 3827.32.00.00 Other, containing substances of subheadings 2903.71 to 2903.75 (kg): General 3.7%; Special Free (A+, AU, BH, CL, CO, D, E, IL, JO, KR, MA, OM,P, PA, PE, S, SG); Column 2 25%.
  • 3827.39.00.00 Other (under: Containing hydrochlorofluorocarbons (HCFCs), whether or not containing perfluorocarbons (PFCs) or hydrofluorocarbons (HFCs), but not containing chlorofluorocarbons (CFCs)) (kg): General 3.7%; Special Free (A+, AU, BH, CL, CO, D, E, IL, JO, KR, MA, OM,P, PA, PE, S, SG); Column 2 25%.
  • 3827.40.00.00 Containing methyl bromide (bromomethane) or bromochloromethane (kg): General 3.7%; Special Free (A+, AU, BH, CL, CO, D, E, IL, JO, K, KR, MA,OM, P, PA, PE, S, SG); Column 2 25%.
  • 3827.51.00.00 Containing trifluoromethane (HFC-23) (kg): General 3.7%; Special Free (A+, AU, BH, CL, CO, D, E, IL, JO, KR, MA, OM,P, PA, PE, S, SG); Column 2 25%.
  • 3827.59.00.00 Other (under: Containing trifluoromethane (HFC-23) or perfluorocarbons (PFCs) but not containing chlorofluorocarbons (CFCs) or hydrochlorofluorocarbons (HCFCs)) (kg): General 3.7%; Special Free (A+, AU, BH, CL, CO, D, E, IL, JO, KR, MA, OM,P, PA, PE, S, SG); Column 2 25%.
  • 3827.61.00.00 Containing 15 percent or more by mass of 1,1,1-trifluoroethane (HFC-143a) (kg): General 3.7%; Special Free (A+, AU, BH, CL, CO, D, E, IL, JO, KR, MA, OM,P, PA, PE, S, SG); Column 2 25%.
  • 3827.62.00.00 Other, not included in the subheading above, containing 55 percent or more by mass of pentafluoroethane (HFC- 125) but not containing unsaturated fluorinated derivatives of acyclic hydrocarbons (HFOs) (kg): General 3.7%; Special Free (A+, AU, BH, CL, CO, D, E, IL, JO, KR, MA, OM,P, PA, PE, S, SG); Column 2 25%.
  • 3827.63.00.00 Other, not included in the subheadings above, containing 40 percent or more by mass of pentafluoroethane (HFC-125) (kg): General 3.7%; Special Free (A+, AU, BH, CL, CO, D, E, IL, JO, KR, MA, OM,P, PA, PE, S, SG); Column 2 25%.
  • 3827.64.00.00 Other, not included in the subheadings above, containing 30 percent or more by mass of 1,1,1,2-tetrafluoroethane (HFC-134a) but not containing unsaturated fluorinated derivatives of acyclic hydrocarbons (HFOs) (kg): General 3.7%; Special Free (A+, AU, BH, CL, CO, D, E, IL, JO, KR, MA, OM,P, PA, PE, S, SG); Column 2 25%.
  • 3827.65.00.00 Other, not included in the subheadings above, containing 20 percent or more by mass of difluoromethane (HFC-32) and 20 percent or more by mass of pentafluoroethane (HFC-125) (kg): General 3.7%; Special Free (A+, AU, BH, CL, CO, D, E, IL, JO, KR, MA, OM,P, PA, PE, S, SG); Column 2 25%.
  • 3827.68.00.00 Other, not included in the subheadings above, containing substances of subheadings 2903.41 to 2903.48 (kg): General 3.7%; Special Free (A+, AU, BH, CL, CO, D, E, IL, JO, KR, MA, OM,P, PA, PE, S, SG); Column 2 25%.
  • 3827.69.00.00 Other (under: Containing other hydrofluorocarbons (HFCs) but not containing chlorofluorocarbons (CFCs) or hydrochlorofluorocarbons (HCFCs)) (kg): General 3.7%; Special Free (A+, AU, BH, CL, CO, D, E, IL, JO, KR, MA, OM,P, PA, PE, S, SG); Column 2 25%.
  • 3827.90 Other (under: Mixtures containing halogenated derivatives of methane, ethane or propane, not elsewhere specified or included).
  • 3827.90.10.00 Chlorinated but not otherwise halogenated (kg): General 6.5%; Special Free (A, AU, BH, CL, CO, D, E, IL, JO, KR, MA, OM, P,PA, PE, S, SG); Column 2 114.5%.
  • 3827.90.90.00 Other (under: Other) (kg): General 3.7%; Special Free (A+, AU, BH, CL, CO, D, E, IL, JO, KR, MA, OM,P, PA, PE, S, SG); Column 2 25%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.