HTS Heading 3911
Petroleum resins, coumarone-indene resins, polyterpenes, polysulfides, polysulfones and other products specified in note 3 to this chapter, not elsewhere specified or included, in primary forms
All 10 HTS codes under heading 3911 (petroleum resins), with their duty rates from the 2026 HTS Revision 23. General duty Free to 6.5%.
Every line of heading 3911
- 3911 Petroleum resins, coumarone-indene resins, polyterpenes, polysulfides, polysulfones and other products specified in note 3 to this chapter, not elsewhere specified or included, in primary forms.
- 3911.10.00.00 Petroleum resins, coumarone, indene or coumarone-indene resins; polyterpenes (kg): General 6.1%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 15.4¢/kg + 49%.
- 3911.20.00.00 Poly(1,3-phenylene methylphosphonate) (kg): General 6.5%; Special Free (A, AU, BH, CL, CO, D, E, IL, JO, K, KR, MA, OM, P,PA, PE, S, SG); Column 2 2.2¢/kg + 33.5%.
- 3911.90 Other (under: Petroleum resins, coumarone-indene resins, polyterpenes, polysulfides, polysulfones and other products specified in note 3 to this chapter, not elsewhere specified or included, in primary forms).
- 3911.90.10.00 Elastomeric (under: Other) (kg): General Free; Special none; Column 2 20%.
- 3911.90.15.00 Poly(nitrilomethanetetraarylnitrilo- [2,4,6-tris-(1-methyethyl)-1,3- phenylene]]-2,6-bis(1-methylethyl)- phenyl]-ω-[[[2,6-bis(1-methylethyl)- phenyl]amino]methylene]amino carbodiimide or 2,4-diisocyanate-1,3,5-tris(1-methyl- ethyl) homopolymer with polyethylene (kg): General Free; Special none; Column 2 15.4¢/kg + 49%.
- 3911.90.25.00 Other (under: Thermoplastic) (kg): General 6.1%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,K,KR,MA,OM,P,PA,PE,S,SG); Column 2 15.4¢/kg + 49%.
- 3911.90.35.00 1,1'-Bis(methylenedi-4,1-phenylene)- 1H-pyrrole-2,5-dione, copolymer with 4,4'-methylenebis(benzeneamine); and Hydrocarbon novolac cyanate ester (kg): General Free; Special none; Column 2 15.4¢/kg + 45%.
- 3911.90.45.00 Other (under: Thermosetting) (kg): General 5.8%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,K,KR,MA,OM,P,PA,PE,S,SG); Column 2 15.4¢/kg + 45%.
- 3911.90.70.00 Chlorinated synthetic rubber (under: Other) (kg): General Free; Special none; Column 2 2.2¢/kg + 33.5%.
- 3911.90.91 Other (under: Other): General 6.5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,K,KR,MA,OM,P,PA,PE,S,SG); Column 2 2.2¢/kg + 33.5%.
- 3911.90.91.10 Thermoplastic (under: Other) (kg).
- 3911.90.91.50 Thermosetting (under: Other) (kg).
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.