HTS Chapter 39
Plastics and articles thereof
The 26 headings and 319 HTS codes of chapter 39 (plastics and articles thereof), with their duty rates from the 2026 HTS Revision 23.
The 26 headings of chapter 39
- 3901: Polymers of ethylene, in primary forms (12 codes, General duty Free to 6.5%)
- 3902: Polymers of propylene or of other olefins, in primary forms (6 codes, General duty Free to 6.5%)
- 3903: Polymers of styrene, in primary forms (6 codes, General duty 6.5%)
- 3904: Polymers of vinyl chloride or of other halogenated olefins, in primary forms (13 codes, General duty Free to 6.5%)
- 3905: Polymers of vinyl acetate or of other vinyl esters, in primary forms; other vinyl polymers in primary forms (9 codes, General duty Free to 5.3%)
- 3906: Acrylic polymers in primary forms (4 codes, General duty Free to 6.3%)
- 3907: Polyacetals, other polyethers and epoxide resins, in primary forms; polycarbonates, alkyd resins, polyallyl esters and other polyesters, in primary forms (17 codes, General duty Free to 6.5%)
- 3908: Polyamides in primary forms (3 codes, General duty Free to 6.5%)
- 3909: Amino-resins, phenolic resins and polyurethanes, in primary forms (8 codes, General duty Free to 6.5%)
- 3910: Silicones in primary forms (1 code, General duty 3%)
- 3911: Petroleum resins, coumarone-indene resins, polyterpenes, polysulfides, polysulfones and other products specified in note 3 to this chapter, not elsewhere specified or included, in primary forms (10 codes, General duty Free to 6.5%)
- 3912: Cellulose and its chemical derivatives, not elsewhere specified or included, in primary forms (8 codes, General duty 4.2% to 6.4%)
- 3913: Natural polymers (for example, alginic acid) and modified natural polymers (for example, hardened proteins, chemical derivatives of natural rubber), not elsewhere specified or included, in primary forms (5 codes, General duty Free to 6.5%)
- 3914: Ion-exchangers based on polymers of headings 3901 to 3913, in primary forms (2 codes, General duty Free to 3.9%)
- 3915: Waste, parings and scrap, of plastics (5 codes, General duty Free)
- 3916: Monofilament of which any cross-sectional dimension exceeds 1 mm, rods, sticks and profile shapes, whether or not surface-worked but not otherwise worked, of plastics (8 codes, General duty 3.1% to 6.5%)
- 3917: Tubes, pipes and hoses and fittings therefor (for example, joints, elbows, flanges), of plastics (23 codes, General duty Free to 6.5%)
- 3918: Floor coverings of plastics, whether or not self-adhesive, in rolls or in the form of tiles; wall or ceiling coverings of plastics, as defined in note 9 to this chapter (15 codes, General duty 4.2% to 6.5%)
- 3919: Self-adhesive plates, sheets, film, foil, tape, strip and other flat shapes, of plastics, whether or not in rolls (13 codes, General duty 5.8% to 6.5%)
- 3920: Other plates, sheets, film, foil and strip, of plastics, noncellular and not reinforced, laminated, supported or similarly combined with other materials (33 codes, General duty Free to 6.5%)
- 3921: Other plates, sheets, film, foil and strip, of plastics (26 codes, General duty 4.2% to 6.5%)
- 3922: Baths, shower baths, sinks, washbasins, bidets, lavatory pans, seats and covers, flushing cisterns and similar sanitary ware, of plastics (3 codes, General duty 6.3%)
- 3923: Articles for the conveyance or packing of goods, of plastics; stoppers, lids, caps and other closures, of plastics (18 codes, General duty Free to 5.3%)
- 3924: Tableware, kitchenware, other household articles and hygienic or toilet articles, of plastics (10 codes, General duty 3.1% to 6.5%)
- 3925: Builders' ware of plastics, not elsewhere specified or included (7 codes, General duty 3.3% to 6.3%)
- 3926: Other articles of plastics and articles of other materials of headings 3901 to 3914 (54 codes, General duty Free to 6.5%)
Where it sits in the schedule
Chapter 39 is in Section VII of the Harmonized System, plastics and rubber (chapters 39 to 40). Rates are those printed in the 2026 HTS Revision 23; Chapter 99 duties (Section 232, Section 301, IEEPA) are charged on top and are not included.
Last reviewed 2026-11-12.