HTS Heading 3923

Articles for the conveyance or packing of goods, of plastics; stoppers, lids, caps and other closures, of plastics

All 18 HTS codes under heading 3923 (articles for the conveyance), with their duty rates from the 2026 HTS Revision 23. General duty Free to 5.3%.

Every line of heading 3923

  • 3923 Articles for the conveyance or packing of goods, of plastics; stoppers, lids, caps and other closures, of plastics.
  • 3923.10 Boxes, cases, crates and similar articles.
  • 3923.10.20.00 Specially shaped or fitted for the conveyance or packing of semiconductor wafers, masks or reticles of subheadings 3923.10 or 8486.90 (kg): General Free; Special none; Column 2 80%.
  • 3923.10.90.00 Other (under: Boxes, cases, crates and similar articles) (kg): General 3%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 80%.
  • 3923.21.00 Of polymers of ethylene (under: Sacks and bags (including cones)): General 3%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 80%.
  • 3923.21.00.11 With no single side exceeding 75 mm in length (thousands).
  • 3923.21.00.20 Other, with sliders that open or close the seal (thousands).
  • 3923.21.00.30 Other (under: Reclosable, with integral extruded closure) (thousands).
  • 3923.21.00.80 With no single side exceeding 75 mm in length (thousands).
  • 3923.21.00.85 Polyethylene retail carrier bags (PRCBs) with handles (including drawstrings), with no length or width shorter than 6 inches (152.4 mm) or longer than 40 inches (1,016 mm) (thousands).
  • 3923.21.00.95 Other (under: Other) (thousands).
  • 3923.29.00.00 Of other plastics (under: Sacks and bags (including cones)) (kg): General 3%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 80%.
  • 3923.30.00 Carboys, bottles, flasks and similar articles: General 3%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 80%.
  • 3923.30.00.10 Of a capacity not exceeding 50 ml (thousands).
  • 3923.30.00.90 Other (under: Carboys, bottles, flasks and similar articles) (kg).
  • 3923.40.00 Spools, cops, bobbins and similar supports: General 5.3%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 80%.
  • 3923.40.00.10 Photographic film reels and reel cans (kg).
  • 3923.40.00.50 Other (under: Spools, cops, bobbins and similar supports) (kg).
  • 3923.50.00.00 Stoppers, lids, caps and other closures (No. and kg): General 5.3%; Special Free (A,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 80%.
  • 3923.90.00 Other (under: Articles for the conveyance or packing of goods, of plastics; stoppers, lids, caps and other closures, of plastics): General 3%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 80%.
  • 3923.90.00.12 Less than 11.36 liters (3 gallons) (No.).
  • 3923.90.00.14 11.36 liters (3 gallons) or more, but not more than 22.71 liters (6 gallons) (No.).
  • 3923.90.00.16 22.71 liters (6 gallons) or more (No.).
  • 3923.90.00.80 Other (under: Other) (No. and kg).

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.