HTS Heading 4004
Waste, parings and scrap of rubber (other than hard rubber) and powders and granules obtained therefrom
The HTS code under heading 4004 (waste), with its duty rates from the 2026 HTS Revision 23. General duty Free.
Every line of heading 4004
- 4004.00.00.00 Waste, parings and scrap of rubber (other than hard rubber) and powders and granules obtained therefrom (kg): General Free; Special none; Column 2 Free.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.