HTS Heading 4005
Compounded rubber, unvulcanized, in primary forms or in plates, sheets or strip
All 4 HTS codes under heading 4005 (compounded rubber, unvulcanized), with their duty rates from the 2026 HTS Revision 23. General duty Free.
Every line of heading 4005
- 4005 Compounded rubber, unvulcanized, in primary forms or in plates, sheets or strip.
- 4005.10.00.00 Compounded with carbon black or silica (kg): General Free; Special none; Column 2 20%.
- 4005.20.00.00 Solutions; dispersions other than those of subheading 4005.10 (kg): General Free; Special none; Column 2 20%.
- 4005.91.00.00 Plates, sheets, and strip (under: Other) (kg): General Free; Special none; Column 2 20%.
- 4005.99.00.00 Other (under: Other) (kg): General Free; Special none; Column 2 20%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.