HTS Heading 4006

Other forms (for example, rods, tubes and profile shapes) and articles (for example, discs and rings), of unvulcanized rubber

All 3 HTS codes under heading 4006 (other forms), with their duty rates from the 2026 HTS Revision 23. General duty Free to 2.9%.

Every line of heading 4006

  • 4006 Other forms (for example, rods, tubes and profile shapes) and articles (for example, discs and rings), of unvulcanized rubber.
  • 4006.10.00.00 "Camel-back" strips for retreading rubber tires (kg): General 2.9%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
  • 4006.90 Other (under: Other forms (for example, rods, tubes and profile shapes) and articles (for example, discs and rings), of unvulcanized rubber).
  • 4006.90.10.00 Of natural rubber (under: Other) (kg): General Free; Special none; Column 2 35%.
  • 4006.90.50.00 Other (under: Other) (kg): General 2.7%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 80%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.