HTS Heading 4008
Plates, sheets, strip, rods and profile shapes, of vulcanized rubber other than hard rubber
All 9 HTS codes under heading 4008 (plates, sheets, strip), with their duty rates from the 2026 HTS Revision 23. General duty Free to 3.3%.
Every line of heading 4008
- 4008 Plates, sheets, strip, rods and profile shapes, of vulcanized rubber other than hard rubber.
- 4008.11 Plates, sheets and strip (under: Of cellular rubber).
- 4008.11.10.00 Of natural rubber (under: Plates, sheets and strip) (kg): General Free; Special none; Column 2 25%.
- 4008.11.50.00 Other (under: Plates, sheets and strip) (kg): General 3.3%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 50%.
- 4008.19 Other (under: Of cellular rubber).
- 4008.19.20.00 Profile shapes (under: Of natural rubber) (kg): General Free; Special none; Column 2 25%.
- 4008.19.40.00 Other (under: Of natural rubber) (kg): General Free; Special none; Column 2 25%.
- 4008.19.60.00 Profile shapes (under: Other) (kg): General 3.3%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 50%.
- 4008.19.80.00 Other (under: Other) (kg): General 3.3%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 50%.
- 4008.21.00.00 Plates, sheets and strip (under: Of noncellular rubber) (kg): General Free; Special none; Column 2 40%.
- 4008.29 Other (under: Of noncellular rubber).
- 4008.29.20.00 Profile shapes (under: Other) (kg): General 2.9%; Special Free (A,AU,B,BH,C,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
- 4008.29.40.00 Other (under: Other) (kg): General 2.9%; Special Free (A,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.