HTS Heading 4009
Tubes, pipes and hoses, of vulcanized rubber other than hard rubber, with or without their fittings (for example, joints, elbows, flanges)
All 12 HTS codes under heading 4009 (tubes, pipes and hoses), with their duty rates from the 2026 HTS Revision 23. General duty 2.5%.
Every line of heading 4009
- 4009 Tubes, pipes and hoses, of vulcanized rubber other than hard rubber, with or without their fittings (for example, joints, elbows, flanges).
- 4009.11.00.00 Without fittings (under: Not reinforced or otherwise combined with other materials) (kg): General 2.5%; Special Free (A*,AU,B,BH,CL,CO,D,E,IL,JO,JP,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 4009.12.00 With fittings (under: Not reinforced or otherwise combined with other materials): General 2.5%; Special Free (A,AU,B,BH,C,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 4009.12.00.20 Brake hoses for the vehicles of subheadings 8701.21, 8701.22, 8701.23, 8701.24 or 8701.29 or headings 8702, 8703, 8704, 8705 or 8711 (kg).
- 4009.12.00.50 Other (under: With fittings) (kg).
- 4009.21.00.00 Without fittings (under: Reinforced or otherwise combined only with metal) (kg): General 2.5%; Special Free (A*,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 4009.22.00 With fittings (under: Reinforced or otherwise combined only with metal): General 2.5%; Special Free (A,AU,B,BH,C,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 4009.22.00.20 Brake hoses for the vehicles of subheadings 8701.21, 8701.22, 8701.23, 8701.24 or 8701.29 or headings 8702, 8703, 8704, 8705 or 8711 (kg).
- 4009.22.00.50 Other (under: With fittings) (kg).
- 4009.31.00.00 Without fittings (under: Reinforced or otherwise combined only with textile materials) (kg): General 2.5%; Special Free (A*,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 4009.32.00 With fittings (under: Reinforced or otherwise combined only with textile materials): General 2.5%; Special Free (A*,AU,B,BH,C,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 4009.32.00.20 Brake hoses for the vehicles of subheadings 8701.21, 8701.22, 8701.23, 8701.24 or 8701.29 or headings 8702, 8703, 8704, 8705 or 8711 (kg).
- 4009.32.00.50 Other (under: With fittings) (kg).
- 4009.41.00.00 Without fittings (under: Reinforced or otherwise combined with other materials) (kg): General 2.5%; Special Free (A*,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 4009.42.00 With fittings (under: Reinforced or otherwise combined with other materials): General 2.5%; Special Free (A,AU,B,BH,C,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 4009.42.00.20 Brake hoses for the vehicles of subheadings 8701.21, 8701.22, 8701.23, 8701.24 or 8701.29 or headings 8702, 8703, 8704, 8705 or 8711 (kg).
- 4009.42.00.50 Other (under: With fittings) (kg).
From MFG Calcs data: Rubber materials and products
U.S. imports of rubber materials and products (headings 4002, 4009, 4010, 4016) came to $9.22B in 2025, with $1.03B in calculated duty: an effective duty of 11.2%, every duty included.
Effective duty in Sep 2026: 10.0%, against 15.2% in Sep 2025.
Largest sources in 2025: Mexico $2.36B at 1.8% effective duty; China $950M at 45.4% effective duty; Japan $798M at 9.4% effective duty; Germany $663M at 9.7% effective duty; Canada $621M at 1.9% effective duty.
These are family totals from U.S. import statistics published through USITC DataWeb, not this heading's rate alone; effective duty is calculated duty as a share of customs value, an estimate, not a ruling.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.