HTS Heading 4014

Hygienic or pharmaceutical articles (including nursing nipples), of vulcanized rubber other than hard rubber, with or without fittings of hard rubber

All 3 HTS codes under heading 4014 (hygienic or pharmaceutical articles), with their duty rates from the 2026 HTS Revision 23. General duty Free to 4.2%.

Every line of heading 4014

  • 4014 Hygienic or pharmaceutical articles (including nursing nipples), of vulcanized rubber other than hard rubber, with or without fittings of hard rubber.
  • 4014.10.00.00 Sheath contraceptives (under: Hygienic or pharmaceutical articles (including nursing nipples), of vulcanized rubber other than hard rubber, with or without fittings of hard rubber) (gross): General Free; Special none; Column 2 25%.
  • 4014.90 Other (under: Hygienic or pharmaceutical articles (including nursing nipples), of vulcanized rubber other than hard rubber, with or without fittings of hard rubber).
  • 4014.90.10.00 Nursing nipples (under: Other) (gross): General Free; Special none; Column 2 25%.
  • 4014.90.50.00 Other (under: Other) (No.): General 4.2%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.