HTS Heading 4013

Inner tubes, of rubber

All 6 HTS codes under heading 4013 (inner tubes, of rubber), with their duty rates from the 2026 HTS Revision 23. General duty Free to 3.7%.

Every line of heading 4013

  • 4013 Inner tubes, of rubber.
  • 4013.10.00 Of a kind used on motor cars (including station wagons and racing cars), buses or trucks: General 3.7%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
  • 4013.10.00.10 Motor car (under: Of a kind used on motor cars (including station wagons and racing cars), buses or trucks) (No.).
  • 4013.10.00.20 Truck and bus (under: Of a kind used on motor cars (including station wagons and racing cars), buses or trucks) (No.).
  • 4013.20.00.00 Of a kind used on bicycles (under: Inner tubes, of rubber) (No.): General Free; Special none; Column 2 30%.
  • 4013.90 Other (under: Inner tubes, of rubber).
  • 4013.90.10.00 Designed for tires provided for in subheadings 4011.70.00, 4012.19.20, 4012.20.15 and 4012.20.45 (No.): General Free; Special none; Column 2 Free.
  • 4013.90.50 Other (under: Other): General 3.7%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
  • 4013.90.50.10 Motorcycle (including moped) (under: Other) (No.).
  • 4013.90.50.50 Other (under: Other) (No.).

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.