HTS Heading 4016
Other articles of vulcanized rubber other than hard rubber
All 22 HTS codes under heading 4016 (other articles), with their duty rates from the 2026 HTS Revision 23. General duty Free to 4.3%.
Every line of heading 4016
- 4016 Other articles of vulcanized rubber other than hard rubber.
- 4016.10.00.00 Of cellular rubber (under: Other articles of vulcanized rubber other than hard rubber) (kg): General Free; Special none; Column 2 25%.
- 4016.91.00.00 Floor coverings and mats (under: Other) (kg): General 2.7%; Special Free (A*,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
- 4016.92.00.00 Erasers (under: Other) (kg): General 4.2%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
- 4016.93 Gaskets, washers and other seals.
- 4016.93.10 Of a kind used in the automotive goods of chapter 87: General 2.5%; Special Free (A*,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 4016.93.10.10 O-Rings (under: Of a kind used in the automotive goods of chapter 87) (kg).
- 4016.93.10.20 Oil seals (under: Of a kind used in the automotive goods of chapter 87) (No., kg).
- 4016.93.10.50 Other (under: Of a kind used in the automotive goods of chapter 87) (kg).
- 4016.93.50 Other (under: Gaskets, washers and other seals): General 2.5%; Special Free (A*,AU,BH,C,CL,CO,D,E,IL,JO,JP,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 4016.93.50.10 O-Rings (under: Other) (kg).
- 4016.93.50.20 Oil seals (under: Other) (No., kg).
- 4016.93.50.50 Other (under: Other) (kg).
- 4016.94.00.00 Boat or dock fenders, whether or not inflatable (kg): General 4.2%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 80%.
- 4016.95.00.00 Other inflatable articles (under: Other) (kg): General 4.2%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 4016.99 Other (under: Other).
- 4016.99.03.00 Containers, with or without their closures, of a kind used for the packing, transporting or marketing of merchandise (kg): General 3%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 80%.
- 4016.99.05.00 Household articles not elsewhere specified or included (kg): General 3.4%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 80%.
- 4016.99.10.00 Handles and knobs (under: Other) (kg): General 3.3%; Special Free (A,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 57.5%.
- 4016.99.15.00 Caps, lids, seals, stoppers and other closures (kg): General 2.7%; Special Free (A,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 80%.
- 4016.99.20.00 Toys for pets (under: Other) (kg): General 4.3%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 80%.
- 4016.99.30.00 Vibration control goods of a kind used in the vehicles of headings 8701 through 8705 (kg): General Free; Special none; Column 2 35%.
- 4016.99.35 Other (under: Of natural rubber): General Free; Special none; Column 2 35%.
- 4016.99.35.10 Rubber bands (under: Other) (kg).
- 4016.99.35.50 Other (under: Other) (kg).
- 4016.99.55.00 Vibration control goods of a kind used in the vehicles of headings 8701 through 8705 (kg): General 2.5%; Special Free (A,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 80%.
- 4016.99.60 Other (under: Other): General 2.5%; Special Free (A,AU,B,BH,C,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 80%.
- 4016.99.60.10 Mechanical articles for motor vehicles (kg).
- 4016.99.60.50 Other (under: Other) (kg).
From MFG Calcs data: Rubber materials and products
U.S. imports of rubber materials and products (headings 4002, 4009, 4010, 4016) came to $9.22B in 2025, with $1.03B in calculated duty: an effective duty of 11.2%, every duty included.
Effective duty in Sep 2026: 10.0%, against 15.2% in Sep 2025.
Largest sources in 2025: Mexico $2.36B at 1.8% effective duty; China $950M at 45.4% effective duty; Japan $798M at 9.4% effective duty; Germany $663M at 9.7% effective duty; Canada $621M at 1.9% effective duty.
These are family totals from U.S. import statistics published through USITC DataWeb, not this heading's rate alone; effective duty is calculated duty as a share of customs value, an estimate, not a ruling.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.