HTS Heading 4017

Hard rubber (for example, ebonite) in all forms, including waste and scrap; articles of hard rubber

The HTS code under heading 4017 (hard rubber (for example, ebonite) in all forms), with its duty rates from the 2026 HTS Revision 23. General duty 2.7%.

Every line of heading 4017

  • 4017.00.00.00 Hard rubber (for example, ebonite) in all forms, including waste and scrap; articles of hard rubber (kg): General 2.7%; Special Free (A,AU,B,BH,C,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 80%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.