HTS Heading 4105
Tanned or crust skins of sheep or lambs, without wool on, whether or not split, but not further prepared
All 3 HTS codes under heading 4105 (tanned or crust skins of sheep or lambs), with their duty rates from the 2026 HTS Revision 23. General duty 2%.
Every line of heading 4105
- 4105 Tanned or crust skins of sheep or lambs, without wool on, whether or not split, but not further prepared.
- 4105.10 In the wet state (including wet-blue).
- 4105.10.10.00 Wet blues (under: In the wet state (including wet-blue)) (m2): General 2%; Special Free (A+,AU,BH,CL,CO,D,E,IL, JO,KR,MA, OM,P,PA,PE,S,SG); Column 2 25%.
- 4105.10.90.00 Other (under: In the wet state (including wet-blue)) (m2): General 2%; Special Free (A+,AU,BH,CL,CO,D,E,IL, JO,KR,MA, OM,P,PA,PE,S,SG); Column 2 25%.
- 4105.30.00.00 In the dry state (crust) (under: Tanned or crust skins of sheep or lambs, without wool on, whether or not split, but not further prepared) (m2): General 2%; Special Free (A+,AU,BH,CL,CO,D,E,IL, JO,KR,MA, OM,P,PA,PE,S,SG); Column 2 25%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.