HTS Heading 4104
Tanned or crust hides and skins of bovine (including buffalo) or equine animals, without hair on, whether or not split, but not further prepared
All 37 HTS codes under heading 4104 (tanned or crust hides), with their duty rates from the 2026 HTS Revision 23. General duty Free to 5%.
Every line of heading 4104
- 4104 Tanned or crust hides and skins of bovine (including buffalo) or equine animals, without hair on, whether or not split, but not further prepared.
- 4104.11 Full grains, unsplit; grain splits.
- 4104.11.10 Upper leather; lining leather: General Free; Special none; Column 2 15%.
- 4104.11.10.20 Upper leather (under: Upper leather; lining leather) (m2).
- 4104.11.10.40 Lining leather (under: Upper leather; lining leather) (m2).
- 4104.11.20.00 Other (under: Whole bovine leather, of a unit surface area not exceeding 28 square feet (2.6 m2)) (m2): General 2.4%; Special Free (A+,AU,BH,CL,CO,D,E,IL, JO,KR,MA, OM,P,PA,PE,S,SG); Column 2 15%.
- 4104.11.30 Buffalo (under: Other): General 2.4%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 4104.11.30.10 Upper leather (under: Buffalo) (m2).
- 4104.11.30.60 Other (under: Buffalo) (m2).
- 4104.11.40 Upper leather; sole leather (under: Other): General 5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 4104.11.40.10 Upper leather (under: Upper leather; sole leather) (m2).
- 4104.11.40.60 Other (under: Upper leather; sole leather) (m2).
- 4104.11.50 Other (under: Other): General 3.3%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 4104.11.50.30 Not split (under: Wet blues) (pcs, kg).
- 4104.11.50.40 Grains (under: Split) (pcs).
- 4104.11.50.70 Other (under: Split) (kg).
- 4104.11.50.80 Other (under: Other) (kg).
- 4104.19 Other (under: In the wet state (including wet-blue)).
- 4104.19.10 Upper leather; lining leather: General Free; Special none; Column 2 15%.
- 4104.19.10.20 Upper leather (under: Upper leather; lining leather) (m2).
- 4104.19.10.40 Lining leather (under: Upper leather; lining leather) (m2).
- 4104.19.20.00 Other (under: Whole bovine leather, of a unit surface area not exceeding 28 square feet (2.6 m2)) (m2): General 2.4%; Special Free (A+,AU,BH,CL,CO,D,E,IL, JO,KR,MA, OM,P,PA,PE,S,SG); Column 2 15%.
- 4104.19.30.00 Buffalo (under: Other) (m2): General 2.4%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 4104.19.40 Upper leather; sole leather (under: Other): General 5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 4104.19.40.10 Upper leather (under: Upper leather; sole leather) (m2).
- 4104.19.40.60 Other (under: Upper leather; sole leather) (m2).
- 4104.19.50 Other (under: Other): General 3.3%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 4104.19.50.30 Not split (under: Wet blues) (pcs, kg).
- 4104.19.50.40 Grains (under: Split) (pcs).
- 4104.19.50.70 Other (under: Split) (kg).
- 4104.19.50.80 Other (under: Other) (kg).
- 4104.41 Full grains, unsplit; grain splits.
- 4104.41.10 Upper leather; lining leather: General Free; Special none; Column 2 15%.
- 4104.41.10.20 Upper leather (under: Upper leather; lining leather) (m2).
- 4104.41.10.40 Lining leather (under: Upper leather; lining leather) (m2).
- 4104.41.20.00 Other (under: Whole bovine leather, of a unit surface area not exceeding 28 square feet (2.6 m2)) (m2): General 2.4%; Special Free (A+,AU,BH,CL,CO,D,E,IL, JO,KR,MA, OM,P,PA,PE,S,SG); Column 2 15%.
- 4104.41.30 Buffalo (under: Other): General 2.4%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 4104.41.30.10 Upper leather (under: Buffalo) (m2).
- 4104.41.30.60 Other (under: Buffalo) (m2).
- 4104.41.40 Upper leather; sole leather (under: Other): General 5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 4104.41.40.10 Upper leather (under: Upper leather; sole leather) (m2).
- 4104.41.40.60 Other (under: Upper leather; sole leather) (m2).
- 4104.41.50.00 Other (under: Other) (m2): General 3.3%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 4104.49 Other (under: In the dry state (crust)).
- 4104.49.10 Upper leather; lining leather: General Free; Special none; Column 2 15%.
- 4104.49.10.20 Upper leather (under: Upper leather; lining leather) (m2).
- 4104.49.10.40 Lining leather (under: Upper leather; lining leather) (m2).
- 4104.49.20.00 Other (under: Whole bovine leather, of a unit surface area not exceeding 28 square feet (2.6 m2)) (m2): General 2.4%; Special Free (A+,AU,BH,CL,CO,D,E,IL, JO,KR,MA, OM,P,PA,PE,S,SG); Column 2 15%.
- 4104.49.30 Buffalo (under: Other): General 2.4%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 4104.49.30.10 Upper leather (under: Buffalo) (m2).
- 4104.49.30.60 Other (under: Buffalo) (m2).
- 4104.49.40 Upper leather; sole leather (under: Other): General 5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 4104.49.40.10 Upper leather (under: Upper leather; sole leather) (m2).
- 4104.49.40.60 Other (under: Upper leather; sole leather) (m2).
- 4104.49.50.00 Other (under: Other) (m2): General 3.3%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.