HTS Heading 4113

Leather further prepared after tanning or crusting, including parchment-dressed leather, of other animals, without wool or hair on, whether or not split, other than leather of heading 4114

All 7 HTS codes under heading 4113 (leather further prepared after tanning), with their duty rates from the 2026 HTS Revision 23. General duty Free to 4.2%.

Every line of heading 4113

  • 4113 Leather further prepared after tanning or crusting, including parchment-dressed leather, of other animals, without wool or hair on, whether or not split, other than leather of heading 4114.
  • 4113.10 Of goats or kids (under: Leather further prepared after tanning or crusting, including parchment-dressed leather, of other animals, without wool or hair on, whether or not split, other than leather of heading 4114).
  • 4113.10.30.00 Not fancy (under: Of goats or kids) (m2): General 2.4%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
  • 4113.10.60.00 Fancy (under: Of goats or kids) (m2): General 2.8%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 30%.
  • 4113.20.00.00 Of swine (under: Leather further prepared after tanning or crusting, including parchment-dressed leather, of other animals, without wool or hair on, whether or not split, other than leather of heading 4114) (m2): General 4.2%; Special Free (A+,AU,BH,CL,CO,D,E,IL, JO,KR,MA, OM,P,PA,PE,S,SG); Column 2 25%.
  • 4113.30 Of reptiles (under: Leather further prepared after tanning or crusting, including parchment-dressed leather, of other animals, without wool or hair on, whether or not split, other than leather of heading 4114).
  • 4113.30.30.00 Not fancy (under: Of reptiles) (m2): General Free; Special none; Column 2 25%.
  • 4113.30.60.00 Fancy (under: Of reptiles) (m2): General Free; Special none; Column 2 30%.
  • 4113.90 Other (under: Leather further prepared after tanning or crusting, including parchment-dressed leather, of other animals, without wool or hair on, whether or not split, other than leather of heading 4114).
  • 4113.90.30.00 Not fancy (under: Other) (m2): General 3.3%; Special Free (A+,AU,BH,CL,CO,D,E,IL, JO,KR,MA, OM,P,PA,PE,S,SG); Column 2 25%.
  • 4113.90.60.00 Fancy (under: Other) (m2): General 1.6%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 30%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.