HTS Heading 4114
Chamois (including combination chamois) leather; patent leather and patent laminated leather; metallized leather
All 4 HTS codes under heading 4114 (chamois (including combination chamois)), with their duty rates from the 2026 HTS Revision 23. General duty 1.6% to 3.6%.
Every line of heading 4114
- 4114 Chamois (including combination chamois) leather; patent leather and patent laminated leather; metallized leather.
- 4114.10.00.00 Chamois (including combination chamois) leather (m2): General 3.2%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 4114.20 Patent leather and patent laminated leather; metallized leather.
- 4114.20.30.00 Patent leather (under: Patent leather and patent laminated leather; metallized leather) (m2): General 2.3%; Special Free (A+,AU,BH,CL,CO,D,E,IL, JO,KR,MA, OM,P,PA,PE,S,SG); Column 2 15%.
- 4114.20.40.00 Calf and kip (under: Patent laminated leather; metallized leather) (m2): General 3.6%; Special Free (A+,AU,BH,CL,CO,D,E,IL, JO,KR,MA, OM,P,PA,PE,S,SG); Column 2 30%.
- 4114.20.70.00 Other (under: Patent laminated leather; metallized leather) (m2): General 1.6%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 30%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.