HTS Heading 4115
Composition leather with a basis of leather or leather fiber, in slabs, sheets or strip, whether or not in rolls; parings and other waste of leather or of composition leather, not suitable for the manufacture of leather articles; leather dust, powder and flour
All 2 HTS codes under heading 4115 (composition leather), with their duty rates from the 2026 HTS Revision 23. General duty Free.
Every line of heading 4115
- 4115 Composition leather with a basis of leather or leather fiber, in slabs, sheets or strip, whether or not in rolls; parings and other waste of leather or of composition leather, not suitable for the manufacture of leather articles; leather dust, powder and flour.
- 4115.10.00.00 Composition leather with a basis of leather or leather fiber, in slabs, sheets or strip, whether or not in rolls (kg): General Free; Special none; Column 2 10%.
- 4115.20.00.00 Parings and other waste of leather or of composition leather, not suitable for the manufacture of leather articles; leather dust, powder and flour (kg): General Free; Special none; Column 2 10%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.