HTS Heading 4205

Other articles of leather or of composition leather

All 6 HTS codes under heading 4205 (other articles of leather), with their duty rates from the 2026 HTS Revision 23. General duty Free to 4.9%.

Every line of heading 4205

  • 4205.00 Other articles of leather or of composition leather.
  • 4205.00.05.00 Belting leather cut or wholly or partly manufactured into forms or shapes suitable for conversion into belting (kg): General 2.9%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 12.5%.
  • 4205.00.10.00 Other (under: Of a kind used in machinery or mechanical appliances or for other technical uses) (kg): General Free; Special none; Column 2 35%.
  • 4205.00.20.00 Shoelaces (under: Other) (kg): General Free; Special none; Column 2 15%.
  • 4205.00.40.00 Straps and strops (under: Other) (kg): General 1.8%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
  • 4205.00.60.00 Of reptile leather (under: Other) (kg): General 4.9%; Special Free (A*,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
  • 4205.00.80.00 Other (under: Other) (kg): General Free; Special none; Column 2 35%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.