HTS Heading 4206
Articles of gut (other than silkworm gut), of goldbeater's skin, of bladders or of tendons
All 4 HTS codes under heading 4206 (articles of gut), with their duty rates from the 2026 HTS Revision 23. General duty Free to 3.9%.
Every line of heading 4206
- 4206.00 Articles of gut (other than silkworm gut), of goldbeater's skin, of bladders or of tendons.
- 4206.00.13.00 If imported for use in the manufacture of sterile surgical sutures (kg): General 3.5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
- 4206.00.19 Other (under: Of catgut): General 3.9%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
- 4206.00.19.10 Racquet strings (under: Other) (m).
- 4206.00.19.30 Other (under: Other) (kg).
- 4206.00.90.00 Other (under: Articles of gut (other than silkworm gut), of goldbeater's skin, of bladders or of tendons) (kg): General Free; Special none; Column 2 40%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.