HTS Heading 4303

Articles of apparel, clothing accessories and other articles of furskin

All 3 HTS codes under heading 4303 (articles of apparel), with their duty rates from the 2026 HTS Revision 23. General duty Free to 4%.

Every line of heading 4303

  • 4303 Articles of apparel, clothing accessories and other articles of furskin.
  • 4303.10.00 Articles of apparel and clothing accessories: General 4%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 50%.
  • 4303.10.00.30 Of mink (under: Articles of apparel and clothing accessories) (No.).
  • 4303.10.00.60 Other (under: Articles of apparel and clothing accessories) (No.).
  • 4303.90.00.00 Other (under: Articles of apparel, clothing accessories and other articles of furskin) (No.): General Free; Special none; Column 2 50%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.